North and South Treatment Facility

Bid/RFP Status: 
Cancelled
Bid/RFP Due Date: 
Tuesday, August 17, 2021 - 2:00pm
Back to Bids/RFPs

The proposed improvements consist primarily of, but are not limited to the following:
New 400 gpm (South site) and 800 gpm (North site) iron and manganese removal facilities, which will treat water
from the existing locations that currently supplies water to the City’s distribution system. Work is
shown on the drawings and described in the specifications but, in part, includes the following elements;

New CMU Buildings, new 1.5 MG & .5 mg Reservoirs, Civil, Site work, Landscaping, Instruments and Controls